Three building systems, one accountable partner

Each building uses the system that fits its height, intended lifespan and programme. We engineer and manufacture all three.

Modern methods of construction

Pioneering modular construction in Saudi Arabia

Tamimi PEB, as pioneers in adopting MMC technology in Saudi Arabia, has embraced modular construction, tunnel form work and prefabrication. Tamimi's experience and international partnerships have enabled the company to introduce cutting-edge technology and expertise, paving the way for broader implementation across the Kingdom.

Our building systems

Light gauge steel pre-fab housing modules
System A

Pre-fab housing

Light gauge steel modules completed almost entirely in the factory and installed on site in days.

Best forWorkforce villages and remote camps

  • Buildings designed using light gauge steel (LGS)
  • Modules leave the factory 90–95% complete
  • Suitable for buildings up to G+2
  • Quick assembly, disassembly and relocation
Factory finish
90–95%
Height
Up to G+2
Structure
Light gauge steel
Useful life
30 years
Volumetric modular building
BOPAS accredited
System B

Volumetric modular

Hot-rolled steel post and beam frames with light gauge steel infill — our BOPAS-accredited system for permanent, multi-storey buildings.

Best forStaff housing, hotels and healthcare

  • Hot-rolled steel frames with light gauge steel infill
  • Modules leave the factory 80–85% complete
  • Suitable for low to high rise
  • BOPAS accredited, with a 60-year durability assessment
Factory finish
80–85%
Height
Low to high rise
Structure
Hot-rolled + LGS
Useful life
60 years
Red steel tunnel formwork on a concrete floor slab, with reinforcement laid for the next pour
System C

Tunnel form work

Factory-made steel formwork lets concrete walls and slabs be cast together on site, floor after floor.

Best forHigh-rise residential

  • Concrete walls and slabs cast in one operation
  • Formwork manufactured in our own factory
  • Suitable for high rise
  • Useful life of traditional concrete buildings
Method
Walls + slabs cast together
Height
High rise
Structure
Reinforced concrete
Formwork
Factory-made
Side by side

Comparing the three systems

Comparison of structure, factory finish, height, useful life and accreditation across our three building systems
AttributePre-fab housingVolumetric modularTunnel form work
StructureLight gauge steelHot-rolled + light gauge steelReinforced concrete
Factory finish90–95%80–85%Formwork prefabricated
HeightUp to G+2Low to high riseHigh rise
Useful life30 years60 yearsAs concrete buildings
AccreditationISO 9001 · 14001 · 45001BOPAS + ISO 9001 · 14001 · 45001ISO 9001 · 14001 · 45001
Two ways to build

Sequential, or in parallel

Conventional construction completes each phase before the next begins. Ours runs the first four together, which is where the time and the cost come out.

Traditional construction

A linear approach, where each phase must be completed before the next can begin.

  1. Initiation
  2. Planning
  3. Design
  4. Execution
  5. Monitoring & control
  6. Closing
Where it costs you
Time delays
High costs
Labour dependency
Environmental impact

MMC at Tamimi PEB

The first four phases — initiation, planning, design and execution — run in parallel, not in sequence.

  1. Initiation
  2. Planning
  3. Design
  4. Execution
What that changes
Speed
Off-site construction. Modules reach site 90–95% finished.
Cost effectiveness
Less material waste and a controlled process make MMC more cost effective.
Labour dependency
Reduces reliance on manual labour, shifting demand towards skilled workers for factory and automation tasks.
Quality control
Stringent quality standards in our factory guarantee every component before it is assembled on site.
Measured impact

What off-site construction saves

Environmental results recorded across Tamimi PEB projects, compared with conventional on-site construction.

46%
fewer site vehicle movements
35%
less manufacturing waste
54%
water reduction
38%
energy efficiency gain vs ASHRAE baseline
25%
lower operational emissions

Revolutionizing construction through MMC innovation

Major construction initiatives like NEOM, the Red Sea Project and Qiddiya are reshaping Saudi Arabia's future, fueling advancements in infrastructure, tourism and entertainment. Contributing 6–7% to the nation's GDP, the construction sector is set for rapid expansion, driven by the ambitious goals of Vision 2030.

Building heights

From single storey to G+5

Pre-fab housing suits buildings up to G+2. Volumetric modular extends to low and high rise, and tunnel form work is used for high-rise concrete construction.

Discuss your building
  • G
  • G+1
  • G+2
  • G+5

Not sure which system fits your project?

Cookie settings

Cookie preferences

Choose what this website may load. You can change this at any time from the link in the footer. Read our cookie policy